Jordan Road at Route 3 Water Main Replacement

The water main  replacement of approximately 400 feet of 8-inch cast iron water main with 8-inch ductile iron water main on Jordan Road at the bridge crossing Route 3 was completed in the summer of 2023.

RFS Corp. of Brockton, Massachusetts completed the work as the Town’s contractor.   

Jordan Road Bridge Water Main Replacement Record Drawing (PDF)